Estimate the material requirement to provide help in preparation of material planning and program to keep the appropriate level of material so that there should not be any problem in manufacturing of the good to me the proper arrangement of material that appropriate transport cost so as to reduce the total cost of materials to provide the assistant in the purchase of raw materials with appropriate quality of the crow material can be purchased economically to inform about the material cost to account section so that the cost of production can be easily determined to minimise winterization of money in the materials from increasing productivity of capital to minimise the cost of material storage and warehousing so that the storage cost of material should not increased to store the material in plant and still manage so that the lost from wastage of raw material and its obsolency can be reduced